Days 1–30
Assessment, scope, permit
On-site walk to identify K&T, aluminum, or other legacy wiring. Detailed scope with room-by-room sequencing. AHJ permit application; PG&E coordination if service-side work is included.
Residential Electrical Services · Pillar Guide
Whole-house rewiring, knob-and-tube replacement, aluminum branch wiring remediation — the work that lets Marin homeowners live in older homes safely without gutting them to do it.

Marin's older housing stock means rewiring work is a significant portion of our residential schedule. Roughly 30% of Marin homes were built before 1950 and may have some original knob-and-tube wiring; another 15% were built during the 1965-1973 window when aluminum branch wiring was common. Both technologies have known safety issues that warrant remediation.
The good news: rewiring an occupied home is operationally manageable in 2026. Modern fishing techniques, careful crew coordination, and good drywall-patch practice mean homeowners can stay in the home during most rewires with only specific rooms unavailable on specific days. The bad news: rewiring is invasive, time-consuming, and expensive — but the alternative (continuing to operate hazardous wiring) is dramatically more expensive when something fails.
Whole-house rewiring is the systematic replacement of branch-circuit wiring throughout a home, typically including new conductors, new outlets and switches at every location, and updated panel terminations — distinct from selective remediation which addresses specific circuits or rooms.
K&T uses ceramic knobs and porcelain tubes to route bare or rubber-insulated conductors through framing. The rubber insulation degrades over decades and the system has no ground conductor. K&T circuits are documented fire hazards; most California insurance carriers now require remediation.
Aluminum branch wiring (distinct from aluminum service-entrance wiring, which is fine) was installed in 1965-1973 due to copper price spikes. The aluminum-to-copper terminations at outlets and switches loosen over time, causing arcing and fire risk. Remediation involves either full replacement with copper or specialized terminations (COPALUM, AlumiConn).
For the broader context this guide supports, see our Residential Electrical Services overview.
Rewiring scopes organized by triggering condition. Featured guides cover the most common scenarios; categorized clusters drill into specific topics.
Three guides to read first
The full whole-house rewire process — assessment, scope, permit, occupied-home logistics, inspection, documentation.
Explore the guide →K&T identification, remediation scoping, insurance documentation, and the realistic process for pre-1950 Marin homes.
Explore → InsuranceIdentification, COPALUM vs full replacement, insurance carrier requirements, and remediation cost.
Explore →Browse the Full Library
Typical 2026 Marin pricing for the most-quoted rewiring scopes.
| Scope | Typical range | Timeline |
|---|---|---|
| Whole-house rewire, 1,500 sqft, occupied | $11,000 to $19,000 | 1-2 weeks elapsed |
| Whole-house rewire, 2,000 sqft, occupied | $14,000 to $26,000 | 2-3 weeks elapsed |
| Whole-house rewire, 3,000 sqft, occupied | $22,000 to $42,000 | 3-4 weeks elapsed |
| K&T-specific remediation (partial scope) | $4,500 to $14,000 | 1-2 weeks |
| Aluminum wire COPALUM termination only | $2,800 to $5,800 | 3-5 days |
| Single-room rewire | $1,800 to $4,500 | 2-3 days |
Yes, for most rewires — and most Marin homeowners do. The work is sequenced room-by-room or floor-by-floor so the homeowner has functional space throughout. A typical 2,000 sqft rewire might affect 2-3 rooms per day during the active work phase; those rooms are unavailable during the work day and back in service by end of day. Kitchen and primary bathroom downtime is coordinated specifically — we work with homeowners to schedule those rooms for days when alternatives are available.
The dust factor is real. Cutting drywall to fish new wiring produces sheetrock dust regardless of how careful the crew is. We use plastic dust barriers, run HEPA air scrubbers in active work areas, and clean daily. Homeowners with severe dust allergies or immune compromises sometimes choose to stay elsewhere during the active rough-in phase (typically the first week of a whole-house rewire); for everyone else, staying in the home is workable.
The realistic 3-phase timeline for a 2,000 sqft occupied-home whole-house rewire.
Days 1–30
On-site walk to identify K&T, aluminum, or other legacy wiring. Detailed scope with room-by-room sequencing. AHJ permit application; PG&E coordination if service-side work is included.
Days 31–60
Bulk of the elapsed time — typically 6-12 working days for a 2,000 sqft home. New cable run from panel to every outlet/switch/fixture location, drywall cuts as needed to fish wire, panel terminations updated.
Days 61–90
New outlets and switches installed, fixtures reconnected, AHJ inspection (typically passes first time for our work), drywall patches and texture matching, paint coordination with homeowner if desired.
For homeowners doing carrier-required remediation (K&T, aluminum), the documentation matters as much as the work itself. Here's what we provide.
The closed permit from your AHJ is the definitive documentation that the work was inspected and approved. We deliver the closed-permit record at project completion.
Photo documentation of original wiring (K&T, aluminum) at every accessible location, paired with after-photos of the replacement work. Formatted for carrier submission.
Written summary describing the scope completed, materials used, AHJ involvement, and any partial scope (if specific circuits weren't remediated). Carrier underwriters use this for renewal eligibility determination.
This guide reflects Towery Electric's professional standards as a California-licensed C-10 electrical contractor and is for general information. Site conditions, panel configurations, code amendments, and permit-authority requirements vary; final scoping, sizing, and code compliance for your specific address are determined on a paid site assessment. We follow California Electrical Code (Title 24, Part 3) and applicable NFPA 70 (NEC) editions adopted by your AHJ.
Fill out the form below and we'll get back to you within 24 hours.
We've received your request and will be in touch within 24 hours.