Underground Electrical Service Conversion: Steps, Planning and PG&E Coordination

Every storm season, branches find the line between the pole and your house. Moving that service underground is a real project with real coordination, and here's what it takes.

Custom home under construction with work trucks, a project well suited to an underground electrical service conversion
Major renovations are a natural time to move a service underground and dig only once.
Quick answer

An underground electrical service conversion replaces the overhead wire from the utility pole to your home with conductors in buried conduit. It involves PG&E design and coordination, a trench, new or relocated meter equipment, permits and inspections. It removes the overhead drop from tree and storm damage, but it's a planned project, not a quick fix.

Key takeaways
  • The overhead service drop runs from the utility pole to your house and is exposed to trees, wind and storms.
  • PG&E says property owners are responsible for vegetation around the service drop.
  • Conversion means a utility design, a trench with conduit, meter work at the house and inspections.
  • Call 811 at least two working days before any digging, so buried utilities are marked.
  • Combining conversion with a panel upgrade, remodel or landscaping project often saves digging twice.

The oaks around your Mill Valley hillside home are part of why you love it, and part of why the service drop gets tangled every storm season. An underground electrical service conversion takes that wire off the poles' path through your trees and puts it in buried conduit. It's one of the most effective ways to protect the connection between your home and the grid.

It's also a project with several players: PG&E, your electrician, a trenching crew and the building department. This guide walks through what's involved, how the steps fit together and what drives the scope, with Mill Valley, Tiburon and Ross hillsides in mind, where slopes, roots and retaining walls shape the plan.

Service conversions often go hand in hand with panel work. Our electrical panel upgrades overview explains how the two connect.

Guide

Part of our guide to Electrical Panel Upgrades. It covers panel replacements, service upgrades and capacity planning.

Thinking about going underground?We'll look at your service, the route and the panel, and explain what conversion involves on your lot.
Book a service consult

What does an underground electrical service conversion involve?

An underground electrical service conversion involves removing the overhead service drop and replacing it with an underground service lateral in conduit. That usually means a utility design, a trench from the connection point to your house, new conduit and conductors, and changes to the meter and service equipment where the line enters the home.

Service drop

The overhead conductors that run from the utility pole to the weatherhead on your house.

Service lateral

The underground conductors that replace a service drop, running in buried conduit from the utility's equipment to your meter.

Exterior wall with an electric meter, disconnects and conduit runs
Conversion changes the equipment where the service enters the house.

The work splits into two sides. The utility side covers PG&E's connection point and its requirements for the conduit and the work near its equipment. The customer side covers the trench on your property, the conduit, the meter enclosure and the panel. Who does each part, and in what order, is set during planning.

At the house, the overhead weatherhead and mast come down, and the meter equipment is replaced or modified to accept an underground feed. Many conversions pair the change with a new meter-main combination panel, which puts the meter and main breaker in one enclosure.

On hillside lots, the route is the hard part. Slopes, retaining walls, root zones, driveways and septic or drainage lines all affect where a trench can go. A good plan finds the shortest practical route that avoids the obstacles.

Why replace an overhead service drop on a wooded lot?

Replacing an overhead service drop on a wooded lot removes the most exposed part of your connection to the grid. Falling limbs, wind and storms can damage or pull down the drop, and that damage can take out power to your home even when the neighborhood stays on.

Responsibility for the trees matters. According to PG&E, property owners are responsible for vegetation around the service drop, the line from the pole to the home, and PG&E can provide a free temporary service disconnect so trimming can happen safely. On heavily wooded lots, keeping that path clear year after year is real work.

What an overhead service drop is exposed to

  • Limbs and whole trees falling during winter storms.
  • Wind that whips branches against the line.
  • Growth that slowly closes in around the conductors.
  • Mast and weatherhead damage when the drop is pulled.

There's a look to consider, too. Many owners in Tiburon and Ross want the roofline clear of wires, especially on view homes. That's a fine reason to convert. Just weigh it with the cost, and plan it with your architect so the meter lands in a tidy spot.

Our guide to wildfire-season electrical safety covers other steps that pair well with conversion on fire-prone hillsides.

01
The problem

A wooded Mill Valley hillside home loses its service drop to branches during storms, and keeping the line clear through the oaks is a constant job.

02
The solution

Convert to an underground service lateral, coordinated with PG&E, routed around roots and retaining walls, and paired with a meter-main upgrade under permit.

03
The resolution

The service line is out of the trees and the roofline is clean. This isn't a fix for utility shutoffs, which still happen upstream, and backup power remains a separate decision.

How does PG&E service conversion coordination work?

PG&E service conversion coordination starts with an application to the utility, which reviews the request and sets requirements for the new underground connection. Your electrician coordinates the customer side, so the trench, conduit and meter equipment match what PG&E needs.

The order of PG&E service conversion work

  1. 01
    Assess and plan

    Your electrician reviews the service, panel and possible routes, and confirms the scope.

  2. 02
    Apply with PG&E

    The utility reviews the request and sets its requirements for the underground connection.

  3. 03
    Permit the customer work

    The electrical permit covers meter, panel and service work on your side.

  4. 04
    Trench and install conduit

    Crews dig, install conduit to the specified depth and route, and pass inspection where required.

  5. 05
    Cut over

    The utility and electrician coordinate the switch from overhead to underground, then remove the old drop.

Expect one short outage on cutover day. The crew needs to switch the house from the old line to the new one. Your electrician will tell you the window. Plan around it, and charge phones and laptops the night before.

Utility timelines vary and aren't in your contractor's control, so build patience into the schedule. Starting the PG&E side early, even while design work continues, is usually the fastest path to a cutover date.

Towery Electric · Novato
Take the service line out of the trees

We plan the route, coordinate the customer side with PG&E and handle the meter, panel and permits.

What does trenching for electrical service require on a hillside?

Trenching for electrical service requires locating existing utilities, planning a route that avoids roots and structures, digging to the depth the utility and code require, and restoring the ground afterward. On hillsides, it also means dealing with slope, rock and access for equipment.

Safety starts before the first shovel. PG&E advises calling 811 at least two working days before digging, so buried utilities are marked. Gas, water, sewer, irrigation and communication lines can all share your yard, and hitting one is dangerous and expensive.

Planning trenching for electrical service around trees

Root zones deserve care, especially under large oaks. An arborist can help identify where trenching would harm major roots, and in some spots boring or hand-digging is gentler than an excavator. Coordinating with your landscape plan avoids tearing up new plantings or hardscape later.

Think about the ground after the trench closes. Pavers, paths and lawn have to go back. Irrigation lines may need repair. Ask who restores what, and put it in writing before work starts. A clean finish is part of a good conversion.

Our notes on hillside wiring cover similar challenges on steep lots, from conduit routes to equipment access.

How does conversion make a wildfire-resilient service?

Conversion makes a wildfire-resilient service by removing the overhead drop that branches and wind can damage, so the connection from the utility to your home isn't exposed through your trees. It's one piece of a resilient setup, not the whole picture.

A wildfire-resilient service doesn't keep power on during a utility shutoff. The California Public Utilities Commission explains that utilities may turn off power to reduce fire risk during strong winds and dry conditions. Underground service on your lot doesn't change what happens upstream, so backup power is still a separate decision.

Overhead vs. underground service on a wooded lot
FactorOverhead dropUnderground lateral
Exposure to falling limbsDirectRemoved on your property
Ongoing tree clearanceOwner's responsibility around the dropNot needed for the service line
Utility shutoffsAffectedStill affected
Project complexityNone, it existsUtility design, trench, permits
AppearanceVisible wire and mastClean roofline

How do you plan an underground electrical service conversion in Mill Valley, Tiburon or Ross?

You plan an underground electrical service conversion by pairing it with other work where possible, getting the utility process started early, and confirming permits before digging. Combining it with a remodel, panel upgrade or landscape project often saves digging and restoring the same ground twice.

Permits are part of every conversion. The County of Marin lists electrical service upgrades among its permit types for unincorporated areas, and Mill Valley, Tiburon and Ross handle permits for addresses inside their limits.

Scope drives cost, so it's worth understanding what moves it: trench length, slope and rock, root protection, meter and panel changes, and restoration of hardscape and planting. Our breakdown of what a 200-amp service upgrade costs in Marin shows how service work is typically priced, and our pages on electrical service upgrades and meter-main combination panels cover the equipment side.

Towery Electric · Novato
Ready to plan a conversion?

Talk with a licensed C-10 electrician about underground service for Mill Valley, Tiburon and Ross hillside homes. Request your estimate or call our office.

Key terms
Weatherhead
The hooded fitting on top of the service mast where overhead conductors enter the house.
Meter-main
A combination enclosure that holds the utility meter and the main breaker together.
811
The national call-before-you-dig number that arranges marking of buried utilities.
Cutover
The coordinated switch from the old overhead service to the new underground one.

Frequently asked questions

How long does an underground electrical service conversion take?

An underground electrical service conversion usually takes longer on the calendar than in physical work, because PG&E review, design and scheduling set the pace, while trenching and meter work take relatively little time once approved. Start the utility side early. Plan permits alongside it. Combine it with other projects if you can. Your electrician will give you the sequence.

Who is responsible for trees around my overhead service drop?

PG&E says property owners are responsible for vegetation around the overhead service drop, the line from the pole to the house, and the utility can provide a free temporary service disconnect so trimming can be done safely. Keep yourself and tools at least 10 feet from power lines. Hire qualified tree workers. Report hazards to PG&E. Conversion removes this upkeep.

What does PG&E service conversion involve for the homeowner?

PG&E service conversion involves applying to the utility, meeting its requirements for the underground connection, and having your electrician handle trenching, conduit, meter equipment and permits on your side of the line. The utility controls its schedule. Your contractor coordinates the details. The final cutover is planned together. Expect a few weeks to months overall.

How deep does trenching for electrical service need to be?

The required depth for trenching for electrical service depends on the utility's specifications for the service lateral and on code rules for the conduit type and location, so it's set during planning rather than chosen on site. Driveways and slopes can change requirements. Call 811 before digging. Inspections may check depth. Your electrician confirms the numbers.

How much does it cost to convert overhead service to underground?

The cost depends mainly on trench length, slope and rock, root protection, meter and panel changes, utility requirements and how much hardscape and landscaping must be restored afterward. Short, open routes cost less. Steep, wooded lots cost more. Pairing with a remodel can save money. We quote after walking the route.

Does underground service keep power on during a PSPS?

No, underground service on your property doesn't keep power on during a Public Safety Power Shutoff, because those shutoffs de-energize lines upstream to reduce fire risk, regardless of how your home is connected. Conversion protects your service line from local damage. Shutoffs still reach you. Backup power is a separate project. Plan both if outages matter to you.

Is a wildfire-resilient service worth it in Mill Valley?

A wildfire-resilient service can be worth it on wooded Mill Valley lots where branches regularly threaten the overhead drop, but on short, clear drops the benefit may not justify the cost and disruption. Consider how often the line has had trouble. Factor in tree maintenance. Compare it with backup power. Your electrician can help you rank them.

Editor’s summary

Converting to underground service takes the line out of the trees and removes ongoing clearance work, but it involves PG&E coordination, trenching and permits. It won't prevent utility shutoffs, so weigh it alongside backup power.

Steven Lockhart
About the authorSteven LockhartFounder/CEO, Healthcare Marketing Group · Lean Six Sigma Black Belt

Founder of Healthcare Marketing Group and author of The Ultimate Guide to Digital Marketing. Previously led a digital marketing company with 8,000+ clients. Writes on local-service SEO and E-E-A-T content strategy.

Alex Towery
Reviewed byAlex Towery, C-10 #989290Owner, Towery Electric, Inc. · Builder-trusted since 2014

Alex founded Towery Electric in Novato in 2014 after years wiring homes in San Francisco. He reviewed this article for technical accuracy on Oct 23, 2026.

How we ensure accuracy
  • ✓ Licensed-contractor reviewed
  • ✓ Primary sources cited
  • ✓ Updated when code changes

We research every article from primary sources, including government safety agencies, code bodies and utility programs, and a licensed C-10 electrical contractor reviews it before it’s published. Our editorial standards →

Sources

  1. Pacific Gas and Electric Company. Vegetation management: trees and power lines.
  2. California Public Utilities Commission. Public Safety Power Shutoffs (PSPS).
  3. County of Marin Community Development Agency. How to apply for a building permit.

Changelog: Oct 23, 2026: first published after technical review by Alex Towery, C-10 #989290.

Disclaimer: This article is general educational information, not a site-specific electrical assessment or legal advice. Codes, utility programs and permit rules change, and every home’s wiring is different. Electrical work in California should be done by a licensed C-10 contractor with the required permits.

When to call: Call a licensed electrician if your service drop or mast is damaged or pulled from the house, or if you're planning a remodel that touches the service. Call PG&E for downed lines. If you see smoke, sparks or fire, leave the area and call 911 first.

Vital Voice Online

Schedule a Consultation

Fill out the form below and we'll get back to you within 24 hours.

Request Sent!

We've received your request and will be in touch within 24 hours.

Something went wrong