Novato · Backup Power

Smart Panels and Battery Backup in Novato

A battery holds a finite amount of energy. A smart panel is what decides where that energy goes, and in what order, when the grid is down for two days.

Steven Lockhart, content editorBy Steven LockhartAlex Towery, licensed C-10 electrical contractorReviewed by Alex Towery, C-10 #989290Updated September 2026

TL;DR

Pairing a smart panel with home battery storage lets a Novato household decide in advance which circuits stay live during an outage, and reprioritise them from an app while it is happening. On the western side of the city, where Public Safety Power Shutoff events are more frequent during fire weather, that is the feature that most often justifies the panel. C-10 licensed (CSLB #989290).

01Why backup changes what a panel is for.

Clean labeled 200-amp panel upgrade in a Novato home

On grid power, a panel distributes as much as anyone asks for. On battery, supply is finite and the question changes from distribution to allocation. Something has to decide that the refrigeration and the well pump matter more than the workshop and the car.

Conventional designs answer this with a separate critical-loads subpanel: a fixed list of circuits, chosen at install, permanently wired to the backed-up side. It works, it is well understood, and it is rigid. The list you picked in year one is the list you have in year seven.

A smart panel answers it with rules instead of wiring. Every circuit can be backed up or not, the priority order can change, and you can reshuffle from the app in the middle of an outage when it turns out the thing you actually need is the one you deprioritised.

02What PSPS exposure actually asks of a Novato household.

A Public Safety Power Shutoff is not a flicker. These are planned, multi-day events during fire weather, and western Novato sees them more often than the bayshore. Designing for a two-hour storm outage and designing for a forty-eight hour shutoff are different exercises.

For a two-day event the honest questions are: what has to stay cold, what has to keep pumping, and what keeps someone working from home. A Level 2 EV charger is almost never on that list — it is among the largest loads in the house and would empty a battery on its own. That is covered from the charging side on the San Marin page.

Well pumps deserve specific mention on the rural west side. A house on a well with no backup for the pump has no water, which reorders most people’s priority list the moment it is pointed out.

03Battery, generator, or both.

A battery is quiet, needs no fuel deliveries, and runs down. A standby generator runs as long as it is fed and is noticeably less subtle. For a multi-day event, natural gas changes the arithmetic considerably — a generator at $8,000 to $14,500 for an 18 to 22kW unit will outlast a battery on any realistic shutoff.

Plenty of Novato households end up with both: battery for the quiet hours and the short interruptions, generator for the long haul. A smart panel coordinates the two more gracefully than a fixed critical-loads subpanel does, which is one of the clearer arguments for it.

04How a Novato panel project actually runs.

Replacing a main service panel in Novato is a three-phase project, and the utility sits in the middle of it wherever the amperage changes.

  1. Days 1–10Assessment, load calculation, itemised estimate. We establish what the existing service actually carries, what condition the equipment is in, and whether the job is a swap at the same amperage or a genuine service upgrade. Those are different projects.
  2. Days 10–35Permit and PG&E coordination. Filed on signature. Where the service amperage grows, PG&E has to be involved on the meter side, and that coordination is usually the longest item in the schedule rather than the labour.
  3. Days 35–45Install day, inspection, labelled panel. Expect four to eight hours without power for a typical replacement. Every circuit is landed and the directory written legibly, which is a code requirement. Inspection follows within about a week.

Two adjacent questions this page does not answer: smart panel novato and load management novato. Both sit under the Backup Power & Generators overview.

Common questions.

Do I need a smart panel to have battery backup?
A smart panel is not required for battery backup, because the traditional approach uses a critical-loads subpanel with a fixed list of backed-up circuits wired at installation. What the smart panel replaces is that rigidity, letting you change the priority order later rather than living with the list you chose in year one.
Which circuits should stay live during a PSPS event?
Typically refrigeration, a well pump where the property has one, some lighting and whatever keeps a home office running, though the correct list is specific to the household. We work it out with you before any hardware is specified, because retrofitting a backed-up load list around installed equipment is far harder than designing it.
Can I charge my car from the battery during an outage?
Charging from stored energy is technically possible and almost never advisable, because a Level 2 charger is among the largest continuous loads in the house and would drain a battery within hours. Most designs exclude the charger entirely, or permit it only when there is genuine surplus production available. Getting it wrong is only discovered during an outage, which is the worst moment to find out.
Is a battery or a generator better for Novato shutoffs?
For the multi-day Public Safety Power Shutoff events that western Novato sees during fire weather, a natural-gas standby generator generally outlasts a battery because it runs as long as it is fed. Batteries are quieter and need no fuel deliveries, which suits short storm interruptions considerably better. That is a design decision, and design decisions are cheap to change on paper.
Can a smart panel work with both a battery and a generator?
Running both is common and coordinating them is one of the clearer arguments for a smart panel, because it can prioritise circuits differently depending on which source is currently carrying the house. A fixed critical-loads subpanel cannot make that distinction, since its wiring does not change with the source. It is the sort of thing worth settling in September rather than during an active shutoff.
How much does whole-home backup cost in Novato?
A whole-home standby generator runs $8,000 to $14,500 for an 18 to 22kW unit with a natural gas hookup, according to Towery’s published Novato ranges. Battery storage is sized by hours of critical load rather than by house size, so it is quoted per project rather than from a range.
What is a critical-loads subpanel?
It is a second, smaller panel holding only the circuits you want backed up, wired at installation and fed from the transfer equipment during an outage. It is the traditional, well-understood and less expensive approach, and for a household with a settled list of essentials it remains the sensible one.
How long will a battery actually last?
That depends entirely on what you have asked it to carry, which is why the backed-up load list matters more than the battery’s headline capacity. A list holding refrigeration, a pump and some lighting behaves very differently from one that quietly includes electric heating or a hot tub. None of that is exotic, but it does need deciding before anything gets ordered.
Do I need to be home to change what is backed up?
With a smart panel you can reprioritise circuits from the app mid-outage, including remotely, which is the practical advantage over a fixed subpanel. With a conventional critical-loads arrangement the list is determined by wiring, so changing it means an electrician and a scheduled visit rather than a setting. We will say plainly when the simpler arrangement covers what you actually need.
What should I sort out before the next fire season?
Decide what genuinely has to run for two days, get the backed-up load list designed rather than assumed, and make sure any well pump is on it. Those three decisions shape the hardware, and making them in September is considerably easier than making them during an active shutoff. The list matters more than the hardware, and it is the part most quotes skip entirely.
How we wrote this

· PSPS programme context references the California Public Utilities Commission.

· Generator pricing reflects the range published on Towery’s Novato service-area guide.

· Code references cite the current NEC (NFPA 70) as adopted by California, plus California Title 24, Part 3.

· Pricing ranges reflect 2026 Towery Electric quote data on Marin projects, not third-party industry averages.

· Technical review by Alex Towery, founder and holder of C-10 licence #989290.

Ready to schedule?

Talk to a licensed electrician in Novato.

Family-run, C-10 #989290. We design the backed-up load list before the hardware, and we will price the simpler subpanel route beside it.

Talk to an electrician(415) 419-5960

Vital Voice Online

Schedule a Consultation

Fill out the form below and we'll get back to you within 24 hours.

Request Sent!

We've received your request and will be in touch within 24 hours.

Something went wrong