Pairing a smart panel with home battery storage lets a Novato household decide in advance which circuits stay live during an outage, and reprioritise them from an app while it is happening. On the western side of the city, where Public Safety Power Shutoff events are more frequent during fire weather, that is the feature that most often justifies the panel. C-10 licensed (CSLB #989290).
01Why backup changes what a panel is for.
On grid power, a panel distributes as much as anyone asks for. On battery, supply is finite and the question changes from distribution to allocation. Something has to decide that the refrigeration and the well pump matter more than the workshop and the car.
Conventional designs answer this with a separate critical-loads subpanel: a fixed list of circuits, chosen at install, permanently wired to the backed-up side. It works, it is well understood, and it is rigid. The list you picked in year one is the list you have in year seven.
A smart panel answers it with rules instead of wiring. Every circuit can be backed up or not, the priority order can change, and you can reshuffle from the app in the middle of an outage when it turns out the thing you actually need is the one you deprioritised.
02What PSPS exposure actually asks of a Novato household.
A Public Safety Power Shutoff is not a flicker. These are planned, multi-day events during fire weather, and western Novato sees them more often than the bayshore. Designing for a two-hour storm outage and designing for a forty-eight hour shutoff are different exercises.
For a two-day event the honest questions are: what has to stay cold, what has to keep pumping, and what keeps someone working from home. A Level 2 EV charger is almost never on that list — it is among the largest loads in the house and would empty a battery on its own. That is covered from the charging side on the San Marin page.
Well pumps deserve specific mention on the rural west side. A house on a well with no backup for the pump has no water, which reorders most people’s priority list the moment it is pointed out.
03Battery, generator, or both.
A battery is quiet, needs no fuel deliveries, and runs down. A standby generator runs as long as it is fed and is noticeably less subtle. For a multi-day event, natural gas changes the arithmetic considerably — a generator at $8,000 to $14,500 for an 18 to 22kW unit will outlast a battery on any realistic shutoff.
Plenty of Novato households end up with both: battery for the quiet hours and the short interruptions, generator for the long haul. A smart panel coordinates the two more gracefully than a fixed critical-loads subpanel does, which is one of the clearer arguments for it.
04How a Novato panel project actually runs.
Replacing a main service panel in Novato is a three-phase project, and the utility sits in the middle of it wherever the amperage changes.
- Days 1–10Assessment, load calculation, itemised estimate. We establish what the existing service actually carries, what condition the equipment is in, and whether the job is a swap at the same amperage or a genuine service upgrade. Those are different projects.
- Days 10–35Permit and PG&E coordination. Filed on signature. Where the service amperage grows, PG&E has to be involved on the meter side, and that coordination is usually the longest item in the schedule rather than the labour.
- Days 35–45Install day, inspection, labelled panel. Expect four to eight hours without power for a typical replacement. Every circuit is landed and the directory written legibly, which is a code requirement. Inspection follows within about a week.
Two adjacent questions this page does not answer: smart panel novato and load management novato. Both sit under the Backup Power & Generators overview.
By Steven Lockhart
Reviewed by Alex Towery, C-10 #989290