Kentfield · Smart Panels

Smart Panels with Solar in Kentfield Homes

A smart panel sits between a Kentfield home’s solar array, its battery and its circuits. Most of the trouble on these projects happens at the scope boundary, not in the equipment.

Steven Lockhart, content editorBy Steven LockhartAlex Towery, licensed C-10 electrical contractorReviewed by Alex Towery, C-10 #989290Updated September 2026

TL;DR

Where a Kentfield home has solar, storage or both, the main service panel is the junction where all three meet, and a smart panel can manage that junction with per-circuit visibility and control. The practical issue is scope boundaries between the solar contractor and the electrician, which should be settled in writing before work starts. C-10 licensed (CSLB #989290).

01Where one trade stops and the other starts.

Custom-home interior lighting installed by Towery Electric in Marin County

On a typical project the solar contractor owns the array, the racking, the inverters and the PV conductors down to the point of interconnection. The electrician owns the service panel, the circuits and what the house does with the power once it arrives. Both are legitimate scopes meeting at one physical point.

Nearly every problem we are called into on these jobs happens at that point, and almost none of them are technical. They are scope questions nobody wrote down: who upgrades the panel if the interconnection needs more capacity, who pulls which permit, whose inspection covers what.

Settle it in writing at the start. One email, and it saves a fortnight.

02The panel upgrade nobody budgeted for.

A recurring pattern: the solar quote assumes the existing panel can take the interconnection, and it turns out it cannot. Now a service upgrade arrives mid-project, unbudgeted, with the array already installed and PG&E coordination landing in the middle of someone else’s schedule.

In Kentfield this happens more than it should, because so much of the housing stock still runs 100 or 125-amp service. A pre-1980s home is a candidate for this problem almost by default.

The fix is boring and reliable. Have the panel assessed before the solar contract is signed. If an upgrade is needed, doing it first is less disruptive and keeps the utility coordination out of the solar contractor’s critical path. We will do that assessment as a standalone piece of work whether or not we do anything else on the project.

03What the smart panel actually contributes here.

Three things. Per-circuit visibility of consumption against production, which is considerably more useful than a single net figure. Control over which loads run when production is high. And, where there is storage, the ability to reprioritise circuits during an outage instead of living with a fixed backed-up list — covered properly on the battery backup page.

What it does not do is make the array bigger or the interconnection simpler. Those are solar-side questions and no panel product changes them, whatever the brochure implies.

04Panel replacement, phase by phase.

The labour is one day. The project is longer than that, and knowing why up front makes the schedule considerably less frustrating.

  1. Days 1–10Assessment, load calculation, itemised estimate. The first visit answers two separate questions: how much capacity is genuinely available, and what state the existing equipment is in. Capacity and condition drive different recommendations and different prices.
  2. Days 10–35Permit and PG&E coordination. The permit goes in immediately, and where the utility is involved we start that conversation in parallel rather than in sequence. Waiting to file until materials arrive wastes the part of the timeline you control.
  3. Days 35–45Install day, inspection, labelled panel. One working day on site for most replacements, with the service isolated properly and the house genuinely dark for part of it. We label as we land circuits rather than guessing afterwards.

Two adjacent questions this page does not answer: smart panel kentfield and battery backup kentfield. Both sit under the full Electrical Panel Upgrades guide.

Common questions.

Why do solar projects here stall at the panel?
Because so much of the Kentfield housing stock still runs 100 or 125-amp service, and a pre-1980s home is a candidate for an interconnection capacity problem almost by default. The quote assumes the panel is fine, and then it turns out not to be. Pre-1980s service and modern interconnection assumptions are a predictable collision here.
What should be in writing before either contract is signed?
Who owns the service panel, who pulls which permit, whose inspection covers which scope, and who carries the cost if the interconnection needs more capacity than exists. Four sentences in an email, and they prevent most of the delay we get called into. Four written sentences prevent most of the delay we get called into.
Can the panel assessment happen before I commit to solar?
It can and it should, and we do it as standalone work whether or not we are involved further on the project. On a mature Kentfield property that one visit is the difference between a planned upgrade and an emergency one mid-installation. On a mature property that visit is worth considerably more than it costs.
Does a battery change the panel conversation?
Considerably, because backed-up load selection and separation of sources come into scope as design decisions rather than afterthoughts to be resolved later by somebody else. Deciding which circuits stay live is far easier before equipment is installed than it is once everything is already on the wall. Design decisions are cheap on paper and expensive once hardware is mounted.
Who permits the electrical scope in Kentfield?
Marin County Building and Safety handles it, because Kentfield is unincorporated and has no city building department of its own to file with. We coordinate our filing with whoever is filing for the solar scope so that the two do not collide. Coordinating the filings keeps two contractors from tripping over each other.
Is a smart panel necessary to pair solar with storage?
It is not necessary, since conventional arrangements using a critical-loads subpanel have paired solar and storage for years perfectly well across Marin and everywhere else. The smart panel replaces a fixed backed-up list with an adjustable one, which matters most to households whose priorities genuinely change. Conventional arrangements have paired solar and storage successfully for years.
What does per-circuit data add on a solar house?
It lets you see consumption against production circuit by circuit rather than as a single net figure, which is more informative when deciding what to run while the sun is up. Whether that is worth the premium depends on whether you will act on it. Whether that data is worth the premium depends on whether anyone acts on it.
Will the electrician second-guess my array size?
We will not, because array sizing is your solar contractor’s job and it sits outside our scope entirely and outside our professional competence. What we will do is tell you honestly whether the service panel can carry the interconnection they have proposed, which is our part of the question. Staying inside our own scope is part of working well alongside another trade.
How long does the panel side take?
On-site work is typically one working day, with four to eight hours of service-side downtime, and the overall timeline depends on County issuance and any utility coordination. Starting it before the solar schedule locks in is what keeps the two from colliding. Starting the longest-lead item first keeps everything behind it moving.
What is the single most avoidable cost on these jobs?
A panel upgrade discovered after the array has already been installed on the roof, unbudgeted and arriving at the worst possible moment in the programme. It is unbudgeted, it drags utility coordination into the middle of another contractor’s programme, and it is prevented entirely by one assessment visit beforehand. It is the most avoidable line item on a residential solar project. Prevention costs one visit; the cure costs a service upgrade and a delay.
How we wrote this

· Scope-boundary guidance reflects the cross-referral relationship between electricians and solar installers described in the client brand book.

· Interconnection requirements follow NEC provisions as adopted by California.

· Code references cite the current NEC (NFPA 70) as adopted by California, plus California Title 24, Part 3.

· Pricing ranges reflect 2026 Towery Electric quote data on Marin projects, not third-party industry averages.

· Technical review by Alex Towery, founder and holder of C-10 licence #989290.

Ready to schedule?

Talk to a licensed electrician in Kentfield.

Family-run, C-10 #989290. We put the scope boundary in writing and assess the panel before anyone signs.

Talk to an electrician(415) 419-5960

Vital Voice Online

Schedule a Consultation

Fill out the form below and we'll get back to you within 24 hours.

Request Sent!

We've received your request and will be in touch within 24 hours.

Something went wrong