Where a Kentfield home has solar, storage or both, the main service panel is the junction where all three meet, and a smart panel can manage that junction with per-circuit visibility and control. The practical issue is scope boundaries between the solar contractor and the electrician, which should be settled in writing before work starts. C-10 licensed (CSLB #989290).
01Where one trade stops and the other starts.
On a typical project the solar contractor owns the array, the racking, the inverters and the PV conductors down to the point of interconnection. The electrician owns the service panel, the circuits and what the house does with the power once it arrives. Both are legitimate scopes meeting at one physical point.
Nearly every problem we are called into on these jobs happens at that point, and almost none of them are technical. They are scope questions nobody wrote down: who upgrades the panel if the interconnection needs more capacity, who pulls which permit, whose inspection covers what.
Settle it in writing at the start. One email, and it saves a fortnight.
02The panel upgrade nobody budgeted for.
A recurring pattern: the solar quote assumes the existing panel can take the interconnection, and it turns out it cannot. Now a service upgrade arrives mid-project, unbudgeted, with the array already installed and PG&E coordination landing in the middle of someone else’s schedule.
In Kentfield this happens more than it should, because so much of the housing stock still runs 100 or 125-amp service. A pre-1980s home is a candidate for this problem almost by default.
The fix is boring and reliable. Have the panel assessed before the solar contract is signed. If an upgrade is needed, doing it first is less disruptive and keeps the utility coordination out of the solar contractor’s critical path. We will do that assessment as a standalone piece of work whether or not we do anything else on the project.
03What the smart panel actually contributes here.
Three things. Per-circuit visibility of consumption against production, which is considerably more useful than a single net figure. Control over which loads run when production is high. And, where there is storage, the ability to reprioritise circuits during an outage instead of living with a fixed backed-up list — covered properly on the battery backup page.
What it does not do is make the array bigger or the interconnection simpler. Those are solar-side questions and no panel product changes them, whatever the brochure implies.
04Panel replacement, phase by phase.
The labour is one day. The project is longer than that, and knowing why up front makes the schedule considerably less frustrating.
- Days 1–10Assessment, load calculation, itemised estimate. The first visit answers two separate questions: how much capacity is genuinely available, and what state the existing equipment is in. Capacity and condition drive different recommendations and different prices.
- Days 10–35Permit and PG&E coordination. The permit goes in immediately, and where the utility is involved we start that conversation in parallel rather than in sequence. Waiting to file until materials arrive wastes the part of the timeline you control.
- Days 35–45Install day, inspection, labelled panel. One working day on site for most replacements, with the service isolated properly and the house genuinely dark for part of it. We label as we land circuits rather than guessing afterwards.
Two adjacent questions this page does not answer: smart panel kentfield and battery backup kentfield. Both sit under the full Electrical Panel Upgrades guide.