Kentfield · Smart Panels

Load Management for Older Kentfield Services

Smart panel load management holds total draw under the service rating, which can let a new load land on the 100 or 125-amp service a great many Kentfield homes still run.

Steven Lockhart, content editorBy Steven LockhartAlex Towery, licensed C-10 electrical contractorReviewed by Alex Towery, C-10 #989290Updated September 2026

TL;DR

Load management keeps a Kentfield home’s total draw below its service rating by throttling or shedding controlled loads when demand peaks. It can allow an EV charger, a heat pump or an induction range onto an existing 100 or 125-amp service that a straight load calculation would reject. The arrangement is documented on the County permit. C-10 licensed (CSLB #989290).

01The word the whole method turns on.

Clean labeled 200-amp panel upgrade in a Novato home

An NEC Article 220 calculation totals worst-case simultaneous demand. Every large load is assumed to be running at once, because on a conventional panel nothing prevents it.

Load management attacks that assumption directly. If a system reliably prevents the charger and the heat pump from both drawing full output at the same moment, the worst case the calculation assumes never occurs, and the calculation can be performed on that basis instead.

In practice the charger pauses or throttles while the oven runs, then resumes. For an overnight charging window that is a distinction without much of a difference. For comfort loads it is handled more conservatively, because a cold house is less forgiving than a car with eight hours to finish.

02Why this matters more in Kentfield than in newer markets.

Two facts collide here. A meaningful share of pre-1980s homes still run 100 or 125-amp service, and the households in them are adding exactly the loads that service was never designed for.

Meanwhile the upgrade itself is expensive in a specific way: it reaches the utility’s meter and the service-entrance conductors, which means PG&E, which means a timeline running on someone else’s calendar. On a mature street with underground service, that utility-side work is usually the costly half rather than the panel.

So a method that legitimately avoids triggering it is worth real money here in a way it would not be in a subdivision built to 200 amps. The same logic from the charging side sits on the charging without an upgrade page.

03What it does not fix.

It does not fix panel condition. Equipment with documented failure-to-trip problems needs replacing whatever the management system does, and clever control on unsafe equipment addresses the wrong problem entirely.

It does not remove the permit or the calculation. The managed arrangement is filed with Marin County so an inspector can verify that the limiting device is genuinely installed and configured as described. Setting a smaller breaker and calling it management is not the same thing.

And it does not always beat the upgrade on cost over time. A household heading toward a heat pump, an induction range and a second EV inside a few years usually spends less removing the limit once than managing around it repeatedly. We will say so when that is the arithmetic.

04From question to installed answer.

The sequence below is deliberately unglamorous. It is also what stops people buying the wrong thing.

  1. Days 1–7Establish what the service actually carries. The first job is separating what you want from what you need: capacity, data, control, or resilience during an outage. Those have different answers and very different prices.
  2. Days 7–14Price the options against each other. With that settled, the estimate carries the realistic options at installed cost, so you are comparing outcomes rather than feature lists written by manufacturers.
  3. Days 14–30Permit, install, inspect. Permit, install, inspect, close. The paperwork is identical whichever way you go, and it stays with the property afterwards.

Two adjacent questions this page does not answer: charging without an upgrade and smart panel kentfield. Both sit under Electrical Panel Upgrades.

Common questions.

What is load management on a Kentfield panel?
It is a system that keeps total household draw below the service rating by throttling or shedding controlled loads when demand peaks. That allows a new large load onto a service which a worst-case load calculation would otherwise reject outright as insufficient. Worst-case simultaneous demand is the assumption the method attacks.
Can it let me avoid a service upgrade?
Frequently yes, and that is its main practical value here, because the utility-side work on an established Kentfield street is the expensive half of any upgrade. Whether it works depends on which of your loads can genuinely be controlled rather than on the product. On a mature street the utility coordination is the bulk of the project.
Will my house behave differently?
Your house behaves almost identically day to day, because controlled loads defer briefly during demand peaks and then resume rather than being switched off entirely. Comfort loads like heating are handled far more conservatively than a car with nine parked hours ahead of it. Deferral for an hour is not the same thing as being switched off.
Is a managed arrangement compliant?
Energy management is recognised within the load calculation provisions, and the arrangement is documented on the Marin County permit application so the inspector can verify that the limiting device is installed and configured exactly as it was filed with them. Documentation is what separates this from simply fitting a smaller breaker.
When should I upgrade the service instead?
When a heat pump, an induction range or a second EV is expected within a few years, since managing around the limit repeatedly costs more in aggregate than removing it once. Panel condition can also force the decision entirely on its own. Panel condition can force the decision entirely independently of capacity.
Why does this matter more on older Kentfield service?
Because a meaningful share of pre-1980s homes here still run 100 or 125-amp service sized for a gas range and a gas furnace. That leaves a specific and fairly small amount of headroom, which the first two electric appliances typically consume. Pre-1980s service sized for gas appliances leaves very little spare.
Does it fix an unsafe panel?
Load management does not fix an unsafe panel at all, and that distinction matters here more than almost anywhere else in the whole decision. Equipment with documented failure-to-trip issues needs replacing whatever the management system does, because clever load control on a panel whose protection is the open question addresses entirely the wrong problem.
Can it be added without a full smart panel?
Management can be added without replacing the panel, because a standalone listed device installed alongside your existing one delivers it perfectly well. A standalone listed device installed alongside your existing panel delivers the management without replacing anything, and it is considerably less expensive than a smart panel. That is frequently the proportionate answer where the goal is one more large load. Replacing nothing is considerably less disruptive than replacing the panel.
What does the inspector actually check?
The inspector confirms that the limiting device is physically present, correctly installed, and configured to match exactly what the submitted application described. That is precisely why this route needs a contractor who documents the arrangement properly, rather than one who quietly sets a smaller breaker and hopes nobody looks closely at it.
How do I find out if it suits my house?
Start with the load calculation, because how far short it comes back determines whether management is a genuine solution or simply a deferral. We price it against the upgrade on one estimate so the comparison is arithmetic rather than advocacy. We price it against the upgrade so the comparison is arithmetic.
How we wrote this

· Energy management described as recognised within NEC load calculation provisions.

· Service-size patterns reflect Towery’s published Kentfield and Greenbrae material.

· Code references cite the current NEC (NFPA 70) as adopted by California, plus California Title 24, Part 3.

· Pricing ranges reflect 2026 Towery Electric quote data on Marin projects, not third-party industry averages.

· Technical review by Alex Towery, founder and holder of C-10 licence #989290.

Ready to schedule?

Talk to a licensed electrician in Kentfield.

Family-run, C-10 #989290. If managing the load genuinely beats growing the service, we will show you the arithmetic.

Talk to an electrician(415) 419-5960

Vital Voice Online

Schedule a Consultation

Fill out the form below and we'll get back to you within 24 hours.

Request Sent!

We've received your request and will be in touch within 24 hours.

Something went wrong