Load management keeps a Kentfield home’s total draw below its service rating by throttling or shedding controlled loads when demand peaks. It can allow an EV charger, a heat pump or an induction range onto an existing 100 or 125-amp service that a straight load calculation would reject. The arrangement is documented on the County permit. C-10 licensed (CSLB #989290).
01The word the whole method turns on.
An NEC Article 220 calculation totals worst-case simultaneous demand. Every large load is assumed to be running at once, because on a conventional panel nothing prevents it.
Load management attacks that assumption directly. If a system reliably prevents the charger and the heat pump from both drawing full output at the same moment, the worst case the calculation assumes never occurs, and the calculation can be performed on that basis instead.
In practice the charger pauses or throttles while the oven runs, then resumes. For an overnight charging window that is a distinction without much of a difference. For comfort loads it is handled more conservatively, because a cold house is less forgiving than a car with eight hours to finish.
02Why this matters more in Kentfield than in newer markets.
Two facts collide here. A meaningful share of pre-1980s homes still run 100 or 125-amp service, and the households in them are adding exactly the loads that service was never designed for.
Meanwhile the upgrade itself is expensive in a specific way: it reaches the utility’s meter and the service-entrance conductors, which means PG&E, which means a timeline running on someone else’s calendar. On a mature street with underground service, that utility-side work is usually the costly half rather than the panel.
So a method that legitimately avoids triggering it is worth real money here in a way it would not be in a subdivision built to 200 amps. The same logic from the charging side sits on the charging without an upgrade page.
03What it does not fix.
It does not fix panel condition. Equipment with documented failure-to-trip problems needs replacing whatever the management system does, and clever control on unsafe equipment addresses the wrong problem entirely.
It does not remove the permit or the calculation. The managed arrangement is filed with Marin County so an inspector can verify that the limiting device is genuinely installed and configured as described. Setting a smaller breaker and calling it management is not the same thing.
And it does not always beat the upgrade on cost over time. A household heading toward a heat pump, an induction range and a second EV inside a few years usually spends less removing the limit once than managing around it repeatedly. We will say so when that is the arithmetic.
04From question to installed answer.
The sequence below is deliberately unglamorous. It is also what stops people buying the wrong thing.
- Days 1–7Establish what the service actually carries. The first job is separating what you want from what you need: capacity, data, control, or resilience during an outage. Those have different answers and very different prices.
- Days 7–14Price the options against each other. With that settled, the estimate carries the realistic options at installed cost, so you are comparing outcomes rather than feature lists written by manufacturers.
- Days 14–30Permit, install, inspect. Permit, install, inspect, close. The paperwork is identical whichever way you go, and it stays with the property afterwards.
Two adjacent questions this page does not answer: charging without an upgrade and smart panel kentfield. Both sit under Electrical Panel Upgrades.