Fairfax · Panel Upgrades

Panel Upgrade Permit in Fairfax: How It Works

Permit paperwork for a Fairfax panel goes to Town Hall, not Marin County, and the Town's site lists no online portal. Here's how the process works, what the inspector checks and why the permit pays off later.

Quick answer

Your panel upgrade permit in Fairfax comes from the Town's Planning and Building Services department, not Marin County. Applications go to the Building Official by email, payment happens in person, and permits are issued Monday through Thursday, 9 to 11 a.m. We pull it in our license name and meet the inspector.

Key takeaways

  • Fairfax is an incorporated town, so its own building department issues the permit. Unincorporated Kentfield, by contrast, files with Marin County.
  • Applications go to the Building Official by email. The Town takes permit payments only in person, and its site lists no online portal.
  • Panel, service, EV and generator work is permitted work in practice. Confirm the exact scope with the Building Official.
  • Unpermitted electrical work can surface when you sell or file an insurance claim, so it's simpler to permit the job up front.
  • We pull the permit in our license name, meet the inspector and coordinate the PG&E release that lets new service equipment go live.
Room under renovation with a stepladder, bare walls and open electrical boxes
Remodels are where panel and service decisions get locked in.

Who issues a panel upgrade permit in Fairfax

Here's the assumption to drop: that Marin County handles every permit in the area. Fairfax incorporated in 1931 (Town of Fairfax[1]), and as a town it runs its own Planning and Building Services department. That office, at Town Hall, 142 Bolinas Road, issues the permit for your panel (Town of Fairfax Planning & Building[2]). Unincorporated Kentfield works differently. It goes through the County's online portal.

Permits are issued Monday through Thursday, 9 to 11 a.m. The Town's website doesn't list an online portal. Completed applications go to the Building Official by email, and payment is taken in person only. For how permits fit into a full panel project, see Towery's panel upgrade overview.

What the electrical permit covers and asks for

The Town's Construction Permit Application lists electrical work as its own category, apart from building, plumbing and mechanical. It asks the contractor for a state license class and number. We fill that in with our C-10 license, #989290.

No Town page lists which electrical jobs need a permit. In practice, the jobs below are permitted work, and the Building Official can confirm your exact scope:

  • Replacing a main panel, same size or larger.
  • Upgrading service, for example from 100 to 200 amps.
  • Adding a sub-panel for a studio, garage or addition.
  • Wiring an EV charger, a generator or a transfer switch.

A sub-panel follows the same path, and Towery's guide to sub-panels in Fairfax covers when one makes sense. A charger has its own page on the EV charger permit in Fairfax.

A license matters as much as the electrical permit. Since January 1, 2025, state law puts the threshold for work that needs a contractor's license at $1,000 (CSLB[3]). Every panel job in our published ranges starts well above that, so whoever does yours needs a license. Our page on panel upgrade pricing in Fairfax lists those ranges.

Final inspection: the Town inspector's visit after the work is done, checking it against the permit and the California Electrical Code. Passing it closes the permit and leaves a record showing the job was done to code.

Panel permit roles in Fairfax: who does what

Most of the permit work sits with us. Here's how the pieces divide.

Fairfax panel permit responsibilities
Step Who handles it What you do
Application Towery, by email to the Building Official Approve the scope
Payment and issuance Towery, in person at Town Hall, Mon–Thu 9–11 a.m. Nothing
Inspection Town inspector, Mon–Thu; we meet them on site Give access to the panel
PG&E disconnect, release and reconnect PG&E, scheduled by Towery Plan for part of a day without power
Permit record Town of Fairfax keeps the closed permit Keep a copy for resale

The Town sets permit fees and can change them, so the fee appears on your estimate, not on this page.

Submitting and paying at the Fairfax building department

The building department runs on email and counter visits, not clicks. We send the completed application to the Building Official, then pay at Town Hall once the permit is ready. Because the Town takes permit payments only in person, a request to pay a Fairfax permit online isn't coming from the Town. Check with Town Hall before you send money anywhere.

A panel upgrade permit in Fairfax moves at the pace of the counter. Permits are issued Monday through Thursday mornings, from 9 to 11. The Town says inspections also run Monday through Thursday, mornings and afternoons (Town of Fairfax building permits[2]). There's no Friday window, so we plan around that. You don't have to chase the Town yourself.

Where a panel upgrade happensPower flows from the PG&E line to the meter, through the main breaker that sets your service size, into the panel busbar and out to branch circuits for kitchen, HVAC and EV loads.PG&E SIDEYOUR SIDELineMeterMainbreakerPanelbusbarKitchen & rangeHeat pump / HVACEV chargerService size (100 / 200 / 400 A) is set here
Simplified view of a home electrical service. A load calculation decides whether the main breaker and busbar can carry what you plan to add.

What the inspector checks at final inspection

The inspector checks the work against the state's electrical code, which has a new edition this year. The 2025 California Building Standards Code took effect January 1, 2026. The state's rulemaking for it included adopting the 2023 National Electrical Code (California Building Standards Commission[4]).

On a panel job, inspectors typically look at grounding and bonding, wire and breaker sizes, the clear working space in front of the panel, and a complete circuit directory. If walls were opened, the inspector may need to see that work before they close. The final inspection confirms the finished job matches the permit.

Most Marin jurisdictions inspect within 5–7 business days of install, and most homes need only one install day. We meet the inspector on site. You just need to give access to the panel. For the countywide view, see Towery's guide to panel permit and inspection.

Panel permit steps, from email to final inspection

Here's the order we follow on a Fairfax panel job. You approve the estimate, and we handle the rest.

  1. Scope and load calculation

    We confirm what's changing, so the permit describes the job accurately.

  2. Application by email

    We send the completed form to the Building Official with our license class and number.

  3. Payment and issuance at Town Hall

    We pay in person and pick up the permit during the Monday–Thursday, 9–11 a.m. window.

  4. Install day with PG&E

    PG&E cuts power, we do the work, and the panel is labeled before we leave.

  5. Final inspection and PG&E release

    The inspector signs off, PG&E gets any release it needs, and the permit closes.

The PG&E release: getting power back on

PG&E, not MCE, is the utility that deals with your hardware. MCE is the default generation provider in Fairfax, while PG&E delivers the power and maintains the lines (MCE[5]). So PG&E is who cuts power for a panel or service job, and who restores it.

When a job changes the service equipment, PG&E looks for clearance from the local inspector before it energizes the new gear. In the trade, that handoff is the PG&E release. We line up the disconnect, the inspection and the release, so the steps don't stall between the Town and the utility.

Three outlet boxes set into a freshly finished wall
Receptacles waiting for devices and cover plates.

How a Fairfax panel permit plays out

Problem

A swap with no paper trail

Picture a pre-1940 cottage with a newer panel and no permit on file for it. The owners want a heat pump, and the new circuit means an inspector will see that panel.

Solution

One permit, clear questions

We ask the Building Official how the Town wants the earlier work handled, then file an electrical permit for the panel and the new circuit. The application goes in by email, and we pay at Town Hall.

Resolution

A closed permit on file

The final inspection passes, the permit closes and the panel is labeled. When the owners sell, the record answers the question before a buyer asks it.

Unpermitted electrical work and selling a Fairfax home

Unpermitted electrical work tends to surface at the worst time, during a sale or an insurance claim. A buyer's inspector may spot a newer panel with no permit on file, and the questions start there. Towery's guide to electrical inspection before closing covers that stage of a sale.

Fairfax's housing age makes this worth checking. About 37% of homes here were built in 1939 or earlier (Town of Fairfax Housing Element[6]), and a house that old can carry layers of past work. If you suspect a past panel swap was never permitted, ask the Building Official how to proceed before you list.

We won't skip a permit to save a week, even on a small panel job. A closed permit is the cleanest answer to a buyer's question.

When Fairfax rules do and don't trigger panel work

Local rules push less than many owners think. Ordinance 856 requires new buildings to be all-electric. It doesn't apply to existing homes, additions or remodels (Town of Fairfax green building page[7]). Ordinance 872 adds electrification measures for single-family additions and alterations (Town of Fairfax reach code summary[8]). We haven't verified its exact triggers. Ask the Building Official before you assume a remodel needs a bigger panel.

The lowest-cost permit is the one you don't need, and that cuts against our own work. Marin County's electrification guide says most homes have 100 amps or more, which is usually enough to electrify (County of Marin[9]). If a load calculation agrees, you can skip the panel job and its permit. Planning a heat pump? Our page on panel upgrade for a heat pump in Fairfax explains how to tell.

The bottom line

Permit it or don't do it. Any change to a Fairfax panel or service should carry a Town permit in the contractor's name and close with a final inspection. If a load calculation says you need no panel work, you need no panel permit either. Either way, ask for the permit number before work starts.

Common questions about panel permits in Fairfax

Which electrical jobs need a permit in Fairfax?

Panel replacements, service upgrades, EV charger circuits and generator installs are permitted work in practice in Fairfax, although no Town page lists every electrical job, so the Building Official is the final word on scope. The Town's application lists electrical work as its own category. If you're unsure, a short email to the Building Official settles it. We include that question in our scoping when it matters. Anything that touches the panel or service, we permit.

How much is the permit fee for a Fairfax panel upgrade?

The Town of Fairfax sets the permit fee for a panel upgrade and can change it, so we don't publish a number here, but the permit is already included in our $3,800 to $6,500 range for a 100-to-200-amp service upgrade. On other panel jobs, the permit is a line on your itemized estimate. The Town accepts payment only in person at Town Hall. We make that trip as part of the job. If anyone asks you to pay a Fairfax permit online, check with the Town first.

How long does a panel upgrade permit in Fairfax take?

A panel upgrade permit in Fairfax moves on the Town's schedule, with permits issued Monday through Thursday from 9 to 11 a.m., and the install itself usually takes one day once the permit and PG&E date are set. Most Marin jurisdictions inspect within 5–7 business days of install. Most of the calendar goes to permit and utility scheduling, not to work in your house. We can't promise the Town's or PG&E's timing. We'll give you dates as soon as we have them.

What if a previous owner replaced my Fairfax panel without a permit?

When a previous owner replaced the panel without a permit, the cleanest next step is to ask the Fairfax Building Official how the Town wants that earlier work handled before you sell, refinance or add new circuits. We can help you ask the right questions and scope any fixes. What the Town requires will depend on what it finds, so we won't guess at it here. Sorting it out before a sale avoids a scramble during escrow. A permit for any new work is a good moment to raise it.

Can a handyman legally replace my electrical panel?

California requires a contractor's license for work at or above $1,000 under AB 2622, which took effect January 1, 2025, and every panel job in our published ranges costs well more than that threshold. Panel work is electrical contracting, which falls under the C-10 classification. CSLB advises checking a license's status online rather than trusting a printed number. Ask who will pull the permit and whose name goes on it. If the answer is nobody, keep looking.

Does the Fairfax inspector check my whole house or just the panel?

A Fairfax electrical inspection centers on the work listed on the permit, so a panel job means the panel, its grounding and bonding, the service connection and any new circuits, not a whole-house audit. If something outside the scope comes up, we'll explain it and price any fix before doing it. For a whole-house review before a sale, ask for that as a separate visit. Our walkthrough after the final inspection shows you what was checked.

Who deals with PG&E during a permitted panel job?

We handle PG&E for you on a permitted panel job, booking the disconnect, coordinating any release the utility needs after inspection and confirming the reconnect, so you don't have to call the utility yourself. PG&E delivers power and maintains the lines in Fairfax, while MCE supplies the generation by default. MCE has no role in the hardware. You'll get the outage date from us in advance. Plan for power to be off for part of one install day.

How we reviewed this page

Written by Steven Lockhart of Healthcare Marketing Group and reviewed for technical accuracy by Alex Towery, owner of Towery Electric, Inc. and holder of California C-10 license #989290. Local rules were checked against Fairfax sources linked below in October 2026; prices match the ranges on our electrical panel upgrades page as of October 2026.

Sources

  1. Town of Fairfax. About Fairfax.
  2. Town of Fairfax. Planning & Building.
  3. Contractors State License Board (CSLB). Handyperson Exemption to Increase to $1,000 in 2025.
  4. California Building Standards Commission (Department of General Services). 2024 Triennial Cycle.
  5. MCE. Frequently Asked Questions – MCE.
  6. Town of Fairfax. Town of Fairfax 2023–2031 Housing Element, Vol. 1 (Final, March 14, 2024).
  7. Town of Fairfax. Fairfax's Efforts to Go Green (Feb. 9, 2023).
  8. Town of Fairfax. Fairfax's Efforts to Go Green.
  9. County of Marin. Get started on home electrification.
  10. Centers for Disease Control and Prevention. What to Do to Protect Yourself From Electrical Hazards.

This page is general information for homeowners, not a substitute for an on-site assessment. Electrical work in California must meet the California Electrical Code and local requirements, and most of the work described here needs a permit. Prices are Marin ranges published on our service pages as of October 2026; your written estimate is the number that counts. Rules and programs change — confirm current requirements with your building department before you plan around them.

Vital Voice Online

Schedule a Consultation

Fill out the form below and we'll get back to you within 24 hours.

Request Sent!

We've received your request and will be in touch within 24 hours.

Something went wrong