The Problem
Homeowner wants a 22kW generator on a Mill Valley hillside home. Driveway is steep, side yard is narrow, meter location is awkward. Bad installers quote without a site walk and underbid scope by $3-5K.
Service Areas · Pillar Guide
From Mill Valley to San Rafael to Larkspur and Corte Madera, the central Marin corridor has the densest mix of mid-century homes in the county. We do panel work, EV charging, generators, and rewires across all of it.

The Central and South Marin corridor is the densest residential electrical territory we work — Mill Valley alone has more 1950s ranch homes still on original 100A service than any other Marin neighborhood. The mix of older stock plus rapidly-electrifying owners (EVs, heat pumps, induction ranges, hot tubs) means panel-capacity work is constantly in demand. Most of our weekly schedule in this corridor is panel upgrades and EV chargers.
What sets central Marin apart from Novato or West Marin is AHJ density: five different permitting authorities across roughly 10 miles, each with their own application process and inspection schedule. We hold active relationships with all five and pre-stage permits the same day estimates are signed.
Central and South Marin in our service definition includes Mill Valley, San Rafael, Larkspur, Corte Madera, Kentfield, Greenbrae, Strawberry, and adjacent unincorporated neighborhoods — the bulk of the 101 corridor between Novato and the Golden Gate.
60% of our Central/South Marin work starts as a different project (EV charger, heat pump, ADU) and reveals that the panel needs to be done first. We catch this in the load calc and structure the quote accordingly — bundled scope, one permit pull, one PG&E coordination.
Tam Valley, Homestead Valley, Larkspur ridge homes often have driveway access constraints that affect generator scope and pad placement. We walk every hillside install in person before quoting.
For the broader context this guide supports, see our Service Areas overview.
Central and South Marin spans five cities plus unincorporated county areas. This pillar organizes the most common work into featured guides and neighborhood-or-topic clusters.
Three guides to read first
Browse the Full Library
The Central Marin housing stock was built largely between 1945 and 1975, with a heavy concentration in the 1950s. Homes from that era were typically built on 60-amp or original 100-amp service — adequate for the appliances of the time (gas range, gas dryer, single window AC unit) but undersized for a modern Marin household with a heat pump, an electric range, an EV charger, and a hot tub.
Our most common Central Marin quote starts with a homeowner wanting an EV charger and ends with a bundled panel-upgrade-plus-charger scope, because the load calculation reveals the existing service doesn't have the capacity. The right answer isn't a smaller charger — it's a 200A panel that supports the home's actual current and future load profile.
Permit issuance timing varies by jurisdiction. These are typical residential electrical permit turnarounds based on our recent project data.
| Jurisdiction | Permit issuance | Inspection | Notes |
|---|---|---|---|
| Mill Valley | 2-5 business days | 5-7 days post-install | Hillside sites may add plan review |
| San Rafael | 3-7 business days | 5-10 days | Largest volume, occasional backlog |
| Larkspur | 2-4 business days | 5-7 days | Generally responsive AHJ |
| Corte Madera | 2-4 business days | 5-7 days | Small AHJ, fast turnaround |
| Marin County (unincorporated) | 5-10 business days | 7-14 days | Larger plan-review queue |
Roughly a third of Central Marin homes are on hillside lots — Tam Valley, Homestead Valley, Larkspur ridges, Kentfield foothills. The challenge is access and pad placement, especially for generator and panel work.
Homeowner wants a 22kW generator on a Mill Valley hillside home. Driveway is steep, side yard is narrow, meter location is awkward. Bad installers quote without a site walk and underbid scope by $3-5K.
We do an in-person site walk before any hillside quote. We measure pad location, check setbacks from windows and eaves, evaluate the gas-line run path, and look at delivery access for the generator unit itself.
Final install includes a properly-sited pad with correct setbacks, a clean gas-line route, and documented PG&E coordination. The homeowner ends up with infrastructure that works the first time without scope creep.
Central Marin homeowners typically get 3-5 estimates per project. Here's what to compare across them.
A real itemized estimate lists labor hours, material costs, permit fees, and inspector coordination separately. Flat-rate quotes that 'cover everything' usually have hidden assumptions that turn into change orders mid-project.
Permit timelines compress when the contractor has an active working relationship with the inspector. Ask any contractor when they last pulled a permit in your specific AHJ.
This guide reflects Towery Electric's professional standards as a California-licensed C-10 electrical contractor and is for general information. Site conditions, panel configurations, code amendments, and permit-authority requirements vary; final scoping, sizing, and code compliance for your specific address are determined on a paid site assessment. We follow California Electrical Code (Title 24, Part 3) and applicable NFPA 70 (NEC) editions adopted by your AHJ.
Fill out the form below and we'll get back to you within 24 hours.
We've received your request and will be in touch within 24 hours.