Common questions.
Can I have one charger and just unplug/plug between two cars?
Yes, this works and it's the cheapest approach — $1,800-$3,200 for a single Level 2 install used by two vehicles. The constraint is human coordination: someone has to physically swap the plug between vehicles. Works well when one driver is consistently home earlier and can swap before the second driver needs the charger, or when one vehicle's daily mileage is low enough to skip charging some nights. Many two-EV households start here and upgrade to dual chargers when the manual swap gets old.
Does load sharing slow down my charging?
Only when both vehicles are plugged in simultaneously. When only one vehicle is plugged in, that vehicle gets the full circuit amperage. When both are plugged in, the chargers split available amperage — typically 24A each on a 48A circuit, which is 22 mph of range vs 44 mph at full rate. Still adds 180+ miles of range over a typical 8-hour overnight charge per vehicle — more than enough for nearly any Marin driver.
Will my existing panel support two EV circuits?
Run the load calc to find out. A 200A panel in a typical Marin home (no heat pump, no major future loads planned) can usually support two independent 40A EV circuits with appropriate load calc results. A 100A or 125A panel almost certainly can't. A 200A panel with heat pump, hot tub, and other significant loads may not. Load management can sometimes solve calc shortfalls for two-EV scenarios; sometimes panel upgrade is the right answer. We do the calc during the quote visit.
Can I add a second EV circuit later if I start with one?
Yes, but it's slightly more cost-efficient to plan for two from the start if you know you'll have two EVs. Adding a second circuit later requires another permit, another install visit, and sometimes routing through different paths than the first circuit. Doing both at the same time (even if you only need one initially — the second circuit's conduit is run but not energized) costs incrementally less than two separate projects. We discuss expansion planning during the quote when you flag a second EV in your plans.
How do you handle pricing — flat fee or hourly?
Both, depending on scope. Routine service calls and predictable scope (panel replacement, EV charger install, transfer switch install, fixture replacement) are flat-fee quoted up front. Diagnostic visits and emergency scope are hourly because we don't know what we'll find. Either way, you get a written quote before work starts on anything significant, and we don't proceed beyond the quote without your sign-off.
How quickly can you schedule?
Depends on scope and season. Emergency dispatch: same-day across Marin County (1-3 hours business hours, 1-4 hours after-hours). Same-day standard service: 3-6 hours from call when capacity allows; otherwise next business day. Scheduled service work: 1-3 weeks typical. Larger projects requiring permits and PG&E coordination: 4-12 weeks depending on scope. We're upfront about timeline at the quote stage.
What warranty do you offer on work?
Our standard residential warranty: 2 years on labor, manufacturer warranty on parts (varies by product — typically 1-10 years). Major installs (panels, generators, EV chargers) often have longer manufacturer warranties (5-10 years). If there's an issue with our work in the warranty period, we come back and fix it at no cost. We also stand behind work past warranty — repeat customers and referrals matter more than a transactional fix.
Are you licensed and insured?
Yes. California State License Board C-10 Electrical Contractor #989290, in good standing. Carry general liability insurance and workers' compensation insurance as required by California law. Bondable on projects requiring it. Happy to provide proof of insurance to clients or property managers on request. License lookup: cslb.ca.gov.